Gitaru Power
Station Extension (1999-2000)
Kenya

Type of Project:
Extension of 1 x 81MW (Francis) Additional Unit at an
Existing Hydro Power Plant
Customer: Voith
Hydro GmbH, Germany
Scope of Work:
Manufacture of the following parts
for an 81MW Francis Turbine:
Installation of the following Turbine
Parts:
- Spiral Casing
- Turbine
- Governor
- Butterfly Main Inlet Valve
- Cooling Water System
- Drainage System
- Electrical Installations
Customer: Siemens
AG, Germany
Scope of Work: Installation
of:
- 95MVA Generator
- 95MVA Transformer
- Unit Control and Protection System
- Electrical Auxiliary System
- 220kV Switchyard Equipment
|