Rehabilitation of Equipment for Existing Hydro Power Plants

 

For Existing Hydro Power Plants we carry out Rehabilitation/Remedial Works on Plant Equipment as required by the Plant Owners.

 

  • Rehabilitation of Turbines Parts
  • Rehabilitation of Generator Parts
  • Rehabilitation/Repair/Repainting of Gates and Penstocks
  • Repainting of Turbine and Generator Parts
  • Rehabilitation of Overhead and Gantry Cranes
Shop Assembly of Draft Tube Liner Section for 60MW Francis Turbine
Shop Assembly of Draft Tube Liner Section for 60MW Francis Turbine
Transport of Draft Tube Liners for 75MW Francis Turbine
Transport of Draft Tube Liners for 75MW Francis Turbine
Transportation of  Draft Tube Liner Segments  for 350MW Pump Turbine
Transportation of Draft Tube Liner Segments for 350MW Pump Turbine
Shop Assembly of Draft Tube Liner for 350MW Pump Turbine
Shop Assembly of Draft Tube Liner for 350MW Pump Turbine
Installation of Turbine Shaft and Runner for 75MW Francis Turbine
Installation of Turbine Shaft and Runner for 75MW Francis Turbine
Main Inlet Valve for 53MW Francis Turbine Installed
Main Inlet Valve for 53MW Francis Turbine Installed
Manufacture of Rotating Sump Cover for 85MW Francis Turbine
Manufacture of Rotating Sump Cover for 85MW Francis Turbine
Transportation of Draft Tube  Cone Half-Pieces
Transportation of Draft Tube Cone Half-Pieces
Transportation of Draft Tube Liner for 60MW Francis Turbine
Transportation of Draft Tube Liner for 60MW Francis Turbine
Transportation of Draft Tube Liner Segments  for 350MW Pump Turbine
Transportation of Draft Tube Liner Segments for 350MW Pump Turbine
Transportation of Stay Ring for 50MW Kaplan Turbine
Transportation of Stay Ring for 50MW Kaplan Turbine
Turbine Distributor for 90MW Francis Turbine Ready for Installation
Turbine Distributor for 90MW Francis Turbine Ready for Installation